R
RenoCalc
Costs by CityBlogAboutContact
For contractors
FRSign in
R
RenoCalc

Free renovation cost calculator for Canadian homeowners. Get instant estimates for your next home improvement project.

Calculators

  • Kitchen Renovation
  • Bathroom Renovation
  • Basement Finishing
  • Basement Apartment
  • Deck Building
  • Roofing
  • Siding
  • Window Replacement
  • Flooring
  • Painting

Resources

  • Costs by City
  • Blog
  • About Us
  • Methodology
  • For Contractors
  • Contact
  • Terms

Popular Cities

  • Toronto
  • Vancouver
  • Montreal
  • Calgary
  • Ottawa
  • Edmonton
  • Winnipeg
  • Halifax
  • Quebec City
  • Victoria

© 2026 RenoCalc.ca. All rights reserved.

Privacy PolicyTerms of Service

Estimates are approximate and may vary based on specific project requirements.

Bathroom Renovation Cost Calculator — Canada 2026

A bathroom renovation delivers some of the highest return on investment of any home project, yet budgeting one accurately is notoriously difficult. Tile selection alone can swing the total by $5,000 or more, and plumbing relocation adds cost that surprises many homeowners. Regional variation is significant: the same 5×8 bathroom renovation runs roughly 15–20% more in Toronto or Vancouver than in Calgary or Halifax, driven primarily by differences in licensed plumber rates and tile installer availability.

This calculator generates a city-specific estimate based on your bathroom size, quality tier, and the features you choose. Select Budget, Standard, or Premium finishes, then configure your vanity, shower vs. tub, tile coverage, plumbing fixtures, ventilation, and optional heated floor. Every toggle updates your cost breakdown in real time, so you can see the exact dollar impact of upgrading from a prefab shower to a custom tile surround, or from a basic vanity to a floating double unit.

Start with the Standard tier and your actual square footage to establish a realistic baseline. If your budget is tight, the breakdown will show you that tile and the shower enclosure typically account for 35–45% of the total — the two places where strategic trade-offs save the most money.

Renovation Cost Calculator

Bathroom Renovation

Select Your Location

Typical cost breakdown (standard tier, national average, 2026)

ItemTypical range
Vanity & Sink$800 – $2,000
Shower$1,500 – $3,500
Bathtub$1,200 – $3,000
Tile Work$1,500 – $3,500
Plumbing$1,200 – $2,800
Fixtures & Hardware$500 – $1,500
Lighting$400 – $1,000
Ventilation$300 – $700
Total$7,400 – $18,000

Cost by city (standard tier, 2026)

CityTypical range
Toronto$7,918 – $19,260
Vancouver$9,176 – $22,320
Montreal$6,882 – $16,740
Calgary$8,510 – $20,700
Ottawa$7,104 – $17,280
Edmonton$8,362 – $20,340
Winnipeg$8,214 – $19,980
Halifax$6,808 – $16,560
Quebec City$6,216 – $15,120
Saskatoon$8,214 – $19,980
Regina$8,066 – $19,620
St. John's$7,252 – $17,640

Cost by quality tier

TierTypical range
Budget — Budget materials$5,180 – $12,600
Standard — Standard quality$7,400 – $18,000
Premium — Premium/luxury$11,840 – $28,800

Estimates are approximate and vary with project scope, site conditions and contractor availability.

Frequently asked questions

How much does a bathroom renovation cost in Canada in 2026?
A bathroom renovation in Canada costs $8,000–$35,000 for a standard 5×8 ft space. A cosmetic refresh (new vanity, fixtures, paint) runs $5,000–$12,000, a mid-range full renovation with tile, shower, and new plumbing fixtures costs $15,000–$25,000, and a spa-style primary ensuite can reach $30,000–$55,000. Toronto and Vancouver typically cost 15–20% more than the national average.
What factors affect bathroom renovation costs?
Key cost drivers include tile selection and area (floor + walls), whether you are moving plumbing, the vanity and countertop tier, shower vs. tub choice, ventilation upgrades, and heated floor installation. Moving plumbing adds $2,000–$6,000. A custom glass shower enclosure alone can cost $2,500–$6,000.
How long does a bathroom renovation take?
A standard bathroom renovation takes 2–4 weeks of construction. Allow an additional 1–3 weeks for design decisions, permits (if plumbing is moved), and material lead times. A full gut renovation of a large ensuite may run 5–8 weeks total.