In London, a standard-quality bathroom renovation runs $6,290 to $15,300, prices below the Canadian average (index 85). A budget version starts around $4,405 and premium work reaches $24,480.
Contractors in London respond with fixed-price quotes. Free, no commitment.
Price by quality level
Budget1 to 2 weeks$4,405 – $10,712
Line item
Range
Share
Vanity & Sink
$476 – $1,190
11 %
Shower
$893 – $2,083
20 %
Bathtub
$714 – $1,785
17 %
Tile Work
$893 – $2,083
20 %
Plumbing
$714 – $1,666
16 %
Fixtures & Hardware
$298 – $893
8 %
Lighting
$238 – $595
6 %
Ventilation
$179 – $417
4 %
Included
Same layout, fixtures replaced in place
Acrylic tub or shower unit
Stock vanity, standard tile on the floor
Not included
Moving drains or vents
Custom tile showers
Heated floors
Standard2 to 4 weeks$6,290 – $15,300
Line item
Range
Share
Vanity & Sink
$680 – $1,700
11 %
Shower
$1,275 – $2,975
20 %
Bathtub
$1,020 – $2,550
17 %
Tile Work
$1,275 – $2,975
20 %
Plumbing
$1,020 – $2,380
16 %
Fixtures & Hardware
$425 – $1,275
8 %
Lighting
$340 – $850
6 %
Ventilation
$255 – $595
4 %
Included
Tiled shower with glass door
Minor plumbing relocation
Semi-custom vanity, quartz top, new fan and lighting
Tile floor and wet walls
Not included
Structural changes
Steam or freestanding tub packages
Premium4 to 8 weeks$10,064 – $24,480
Line item
Range
Share
Vanity & Sink
$1,088 – $2,720
11 %
Shower
$2,040 – $4,760
20 %
Bathtub
$1,632 – $4,080
17 %
Tile Work
$2,040 – $4,760
20 %
Plumbing
$1,632 – $3,808
16 %
Fixtures & Hardware
$680 – $2,040
8 %
Lighting
$544 – $1,360
6 %
Ventilation
$408 – $952
4 %
Included
Full layout redesign
Curbless shower, freestanding tub, heated floor
Custom vanity, stone or large-format tile throughout
Designer fixtures and lighting
Not included
Adding a bathroom where none exists (see the basement bathroom guide)
Get 3 real quotes for your bathroom in London
See what local contractors actually charge. Free, no commitment, fast response.
Free · No spam · Fast response · You choose who to hire
What changes the price in London
In London, Ontario, a standard-quality bathroom renovation typically costs between $6,290 and $15,300 in 2026 — prices are below the Canadian average, with a local cost index of 85%. Expect around 2 to 5 weeks of work and a 60–70% return on investment at resale.
What’s specific to London bathrooms
Bathrooms in London’s older houses, in Old North, Wortley Village and Blackfriars, were often fitted into the original layout rather than planned, so walls and floors may not line up with standard rough-in dimensions and fixtures can need custom fitting. Older houses may also have cast-iron drain stacks: if a wall opens, ask for the stack as its own line in the quote. A heated floor adds an electrical circuit, so the electrician belongs in the quote, not only the tile setter.
Health Canada says a home built before 1960 probably contains lead-based paint, and one built between 1960 and 1990 may have it on the exterior and in smaller amounts inside. Do not use sanders, heat guns or blowlamps on it, have a paint chip tested or hire a contractor with an x-ray detector, and keep children and pregnant people away from the work. Health Canada — lead-based paint
Health Canada says asbestos was used mainly to insulate homes before 1990 and may still be in siding, plaster, floor and ceiling tiles, roofing products, drywall, caulking and pipe insulation. Undisturbed it is not a significant risk: have it tested by a professional before renovating, and hire a qualified removal specialist if it is found. Health Canada — asbestos
In London, no building permit is needed to re-shingle a roof, replace a window with one of the same size, re-clad with the same material, install cabinets, paint, or replace a plumbing fixture in the same place. A permit is needed for new or enlarged windows, a change of cladding material (siding to brick, for example), a roof alteration that raises it or changes its slope, and adding, removing or moving a sink, tub, toilet or shower. City of London — before you apply for a building permit
London’s review target, counted from the day an application is deemed complete, is 10 business days for renovations and additions to detached, semi-detached and townhouse dwellings and for decks, sheds and detached garages, and 15 business days for secondary dwelling units in houses. City of London — before you apply for a building permit
For electrical work, the Electrical Safety Authority says to hire a Licensed Electrical Contractor, who files the notification of work with ESA. Ask for the contractor’s ECRA/ESA licence number, check it with ESA’s Find a Contractor tool, and ask for the Certificate of Acceptance once the work is done. Electrical Safety Authority (Ontario)
Ontario law requires a home renovation contract over $50 to be in writing. If you sign it at home, you have 10 calendar days to cancel without fees, counted from the day you receive the written copy. When an estimate is part of the contract, the final price cannot exceed it by more than 10 % unless you agreed to new work or a new price. The province recommends a deposit of no more than 10 % and never paying in full before the work is done. Government of Ontario — home renovation rights
The renovation market in London
London’s housing mixes Victorian and early twentieth-century homes in Old North and Wortley Village with post-war and newer suburbs, and Western University keeps rental properties near campus in steady need of updates. Older homes can hide outdated wiring and plumbing, so ask how each quote handles what is found once walls are open, and get the start date in writing.
Climate considerations
London has cold, snowy winters and humid summers. Roofs need protection at the eaves and good attic ventilation against ice dams, and basements need ventilation and moisture control in summer. Outdoor projects are easiest to schedule outside the winter months.
What to ask the contractor before you sign
Ask for proof of liability insurance and, where it applies, workers’ compensation coverage, dated within the year.
Get a written contract that lists the scope, the materials by brand and grade, the schedule, and what is excluded.
Agree on a deposit that matches materials ordered, not a share of the whole job, and tie further payments to milestones you can see.
Ask who pulls the permit, who schedules inspections, and whether the quote includes the permit fee.
Compare three quotes on the same written scope; the cheapest one usually left something out.
Ask for two recent references for the same kind of job, and call them.
Frequently asked questions
How much does a bathroom renovation cost in London in 2026?
In 2026, a bathroom renovation in London costs between $4,405 (budget) and $24,480 (premium). The average standard cost ranges from $6,290 to $15,300.
How long does a bathroom renovation typically take?
A standard bathroom renovation typically takes 2 to 5 weeks. Premium projects or surprises (structural issues, delivery delays) can extend it. Always get a written schedule from your contractor before signing.
What is the resale ROI on a bathroom renovation?
A bathroom renovation typically returns 60–70% at resale in Canada. The exact figure depends on material choices, the current state of the London housing market, and quality of execution.
Do I need a permit for a bathroom renovation in London?
Most Canadian municipalities require permits for structural, plumbing, and electrical work. Purely cosmetic work (paint, flooring, countertops) typically doesn't. Check with the London building department before starting.